27 March 2020 – 100% Construction Drawings for Proposed Bicycle/Multi-use Path – click here

Please click on link below to view drawings. If you have some basic questions (we still have a lot of research to do), call Bill @251-1543. I will try to help you interpret the drawings.

100% Bike Path Construction Drawings